There have been multiple accounts created with the sole purpose of posting advertisement posts or replies containing unsolicited advertising.

Accounts which solely post advertisements, or persistently post them may be terminated.

mikeboltonshair ,

As others here have already mentioned the infrastructure costs alone are a huge problem, where I live we are currently just trying to electrify the corridor and it’s not even the entire system, once again the overall rail infrastructure is already there (it’s just electrification) yet this is still going to take a minimum of a decade and the minimum cost is going to be more than $11bn, technically this saves money as you don’t need to buy a new fleet of rolling stock just upgrade the old ones.

So ya for a maglev you would need a completely different infrastructure and the rolling stock

  • All
  • Subscribed
  • Moderated
  • Favorites
  • [email protected]
  • random
  • lifeLocal
  • goranko
  • All magazines