Isn’t strong or weak mean where the cut needs to be on the line? Since the blade is usually 1/8", weak means that the cut is made before the line, removing the thickness of the blade on the measurement (1 1/2" becomes 1 3/8") and strong means that the cut is made after the line, leaving the actual measurement. This is how I was thought, but I am not in the construction industry.