Completely changing the construction method of the foundation of a whole house, making it out of 90% cement/10% electrolyte (releasing 200 extra tonnes of CO2) rather than 20% cement/80% gravel and increasing costs by tens of thousands for the same effect as a 70kg $2.5k rrp battery (which will be a 50kg $500 battery in two years)?
Doesn’t seem huge other than in the literal size sense.